[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • mindlight@lemm.ee
    link
    fedilink
    English
    arrow-up
    11
    ·
    29 days ago

    I’m pretty sure they essentially are “one time use” only.

    Extremely simplified:

    They run for 20-30 years without refueling, which means the reactors/system could be built more compact, a higher level of safety and require less maintenance / monitoring / fine-tuning.

    All those parameters are connected in an equation which means if you want higher safety you have to make another parameter “worse”. By making the system “one time use” you set the “refuelability” and “repairability” parameters to the lowest and can therefore up the other parameters.

    Also, military requirements are very different from civilian.